Installation Procedure
- Install the battery positive cable to the generator and secure the positive cable with the nut (1) and tighten to 9 N.m (80 lb in).
- Install the generator and secure the generator with 3 bolts and tighten to 50 N.m (37 lb ft).
- Install the engine lift hook and secure the lift hook with 2 bolts and tighten to 50 N.m (37 lb ft).
- Install the A/C line bracket to the lift hook and secure the bracket with the bolt and tighten to 10 N.m (89 lb in).
- Install the drive belt. Refer to Drive Belt Replacement .
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution
.