Exploded View
Special Tools Required
- Driver, 40 mm I.D. 07746-0030100
- Attachment, 30 mm I.D. 07746-0030300
NOTE:
Refer to the EXPLODED VIEW , as needed, during this procedure.
- Clean all the parts in solvent, dry them, and apply MTF to all contact surfaces except the 3rd/4th and 5th/6th synchro hubs.
- Install the needle bearing and 3rd gear on the mainshaft.
- Install the double cone synchro assembly (A) by aligning the synchro cone fingers (B) with the holes in 3rd gear (C), then install the synchro spring (D).
- Install the 3rd/4th synchro hub (A) by aligning the synchro ring fingers (B) with the grooves in the 3rd/4th synchro hub (C).
- Install the 3rd/4th synchro hub (A) using the 40 mm I.D. driver (B).
- Install the 3rd/4th synchro sleeve (A) by aligning the stops (B) of the 3rd/4th synchro sleeve and 3rd/4th synchro hub. After installing, check the operation of the 3rd/4th synchro hub set.
- Install the synchro spring (A).
- Install the double cone synchro assembly (B) by aligning the synchro ring fingers (C) with the grooves in the 3rd/4th synchro hub (D).
- Install 4th gear (A) by aligning the synchro cone fingers (B) with the holes in 4th gear (C).
- Install the needle bearings, 4th/5th gear distance collar, 5th gear, and the 5th gear synchro spring and synchro ring.
- Install the 5th/6th synchro hub (A) by aligning the synchro ring fingers (B) with the grooves in the 5th/6th synchro hub (C).
- Install the 5th/6th synchro hub (A) using the 40 mm I.D. driver (B) and 30 mm I.D. attachment (C).
- Install the 5th/6th synchro sleeve.
- Install the synchro spring (A).
- Install the synchro ring (B) by aligning the synchro ring fingers (C) with the grooves in the 5th/6th synchro hub (D).
- Install the 6th gear distance collar, needle bearing, and 6th gear.
- Install the new angular ball bearing (A) using the 40 mm I.D. driver (B), 30 mm I.D. attachment (C), and press (D).