Inspection Outline
- The components to be tested are indicated by a dotted line.
| Inspection Items | Work Items | |
|---|---|---|
| a | Engine Start/Stop Switch | Do the Engine Start/Stop Switch Test |
| b | External Circuit | +B_SMART, SS1(+), SS2(-), GND Circuit Inspection |
| c | Body Control Module | Body Control Module Inspection |