SG6 Open Wire Inspection
NOTICE:
Before disconnecting the PCM connector, jump the SCS line with the HDS, and wait more than 1 minute.
Test Procedure
- Preparation
-
- -
Brake booster pressure sensor connector (3P): disconnected
- -
PCM connector E (80P): disconnected
- -
- Procedure
-
- -
Perform the inspection according to the following table.
- -
(Disconnected)Brake booster pressure sensor connector (3P)female terminals
(Disconnected)PCM connector E (80P) - Refer to: PCM Connector for Inputs and Outputs (1.5L Engine) or PCM Connector for Inputs and Outputs (2.0L Engine) (2024 2025) female terminals
IG Mode
Normal Conditions
SG6 open wire inspection
OFF
There is less than 1 Ohm
Results
- If abnormal, there is a problem in the circuit.