FixVault

Power Master

In the E65/66 the power master function is in the control display and is now integrated in the M-ASK. The power master performs the wake-up, initialization, power-down functions.

The power master wakes the bus and is responsible for ensuring correct initialization of the network. The network master is also responsible for initiating the power-down. Each power-down is requested at this master and initialized by it.