FixVault

Cyclic Check

Once the pre-drive check has been successfully completed and the system is ready for operation, a cyclic check for the purposes of fault monitoring is performed. The cyclic check continues to be carried out as long as the system status is Terminal R "ON."

The following tests are performed as part of the cyclic check: