FixVault

Installation Procedure

  1. Connect the electrical connectors (1).
  2. Install the DIM into the bracket.
  3. Install the right sound insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT - RIGHT in Instrument Panel, Gages and Console.
  4. Reprogram the DIM. Refer to BODY CONTROL MODULE (BCM) PROGRAMMING/RPO CONFIGURATION (IPM)  .
    Fig 1: Connecting Electrical Connectors
    G01535235Courtesy of GENERAL MOTORS CORP.