FixVault

Installation Procedure

  1. Connect the electrical connectors from the lamp control module (2).
  2. Install the lamp control module bracket (2) to the instrument panel.
    Fig 1: Connecting Electrical Connectors & Fasteners
    G01532594Courtesy of GENERAL MOTORS CORP.
  3. Reposition the heater A/C duct.
  4. Install the fasteners (2) securing the heater A/C duct.
    Fig 2: Installing Fasteners Securing Heater A/C Duct
    G01532595Courtesy of GENERAL MOTORS CORP.
  5. Install the lower IP trim panel. Refer to INSTRUMENT PANEL (I/P) ASSEMBLY REPLACEMENT in Instrument Panel, Gages and Console.