Installation Procedure
- Install the generator rear brace.
- Install the generator rear brace bolt (1).
- Install the generator rear brace nut (2).
- Tighten the generator bolts in the order described. The following is a mandatory torque sequence:
Tighten:
- Tighten the generator rear brace bolt (1) to 50 N.m (37 lb ft).
- Tighten the generator rear brace nut (2) to 50 N.m (37 lb ft).
- Install the EVAP canister purge solenoid valve. Refer to Evaporative Emission (EVAP) Canister Purge Solenoid Valve Replacement (L36) or Evaporative Emission (EVAP) Canister Purge Solenoid Valve Replacement (L67) Engine Controls - 3.8L.
- Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement (L36) or Fuel Injector Sight Shield Replacement (L67) Engine Mechanical - 3.8L.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.