FixVault

Installation Procedure

  1. Connect the transmission oil cooler line to the quick connect fittings. Refer to Transmission Fluid Cooler Line Quick Connect Fitting .
  2. Fig 1: View Of Oil Cooler Pipes, Fittings & Retaining Bracket
    GM811636Courtesy of GENERAL MOTORS CORP.
  3. Install the oil cooler pipes (3,4) to the oil cooler fittings (2).
  4. NOTE: Refer to Fastener Notice in Cautions and Notices.
  5. Install the transaxle oil cooler hose/pipes retaining bracket bolt (5).

    Tighten:  Tighten the bolt to 4 N.m (27 lb in).

  6. Install the lower radiator air deflector. Refer to Radiator Air Baffle and Deflector Replacement - Lower in Engine Cooling.
  7. Remove the drain pan from under the vehicle.
  8. Lower the vehicle.
  9. NOTE: Refer to Transmission Overfill Notice in Cautions and Notices.
  10. Adjust the fluid level.
  11. Inspect for proper completion of the repairs.
  12. Inspect for fluid leaks. Refer to Fluid Leak Diagnosis .