Installation Procedure
- Install the knock sensor.
Tighten: Tighten the sensor to 18 N.m (13 lb ft).
- Connect the knock sensor wiring harness electrical connector to the knock sensor.
- Install the knock sensor heat shield and bolts.
Tighten: Tighten the bolts to 60 N.m (44 lb ft).
- Fill the cooling system. Refer to Cooling System Draining and Filling (Static Fill) or Cooling System Draining and Filling (Vac-N-Fill) .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
DO NOT apply thread sealant to sensor threads. The sensor is coated at factory and applying additional sealant will affect the sensors ability to detect detonation.