FixVault

Component Testing

IMPORTANT: You must perform the Circuit/System Testing before proceeding with the Component Testing.
  1. Ignition ON, remove the MAP sensor.
  2. Install a 3A fused jumper wire between the 5-volt reference circuit terminal C and a corresponding terminal of the MAP sensor.
  3. Install a jumper wire between the low reference terminal A and ground at the MAP sensor.
  4. Install a jumper wire at the signal terminal B of the MAP sensor.
  5. Connect a DMM between the jumper wire from terminal B of the MAP sensor and ground.
  6. Install a J 35555  to the MAP sensor vacuum port. See Special Tools . Slowly apply vacuum to the sensor while monitoring the voltage on the DMM. The voltage should vary between 0-5.2 volts without any spikes or dropouts.
    • If the voltage is not within the specified range or is erratic, replace the MAP sensor.