Installation Procedure
- Install the knock sensor.
Tighten: Tighten the sensor to 18 N.m (13 lb ft).
- Connect the engine harness electrical connector (1) to the knock sensor.
- Fill the cooling system. Refer to Draining and Filling Cooling System (Static Fill) or Draining and Filling Cooling System (Vac-N-Fill) .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
DO NOT apply thread sealant to sensor threads. The sensor is coated at factory and applying additional sealant will affect the sensors ability to detect detonation.