Removal Procedure
NOTE:
- Replacement cables need to be the same type, diameter and length as the original cables
- Always use the same cable routing as the original cable.
- Remove the coolant recovery tank. Refer to Coolant Recovery Reservoir Replacement (LGD) .
- Disconnect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
- Remove the carpet. Refer to Front Floor Panel Carpet Replacement , and Rear Floor Panel Carpet Replacement .
- Loosen the positive battery cable nut (2).
- Separate the positive battery cable (1) from the battery.
- Remove the positive battery cable retainer (3) from the floor pan stud (4).
- Remove the positive battery cable nut (1) from the junction block stud.
- Remove the positive battery cable terminal (2) from the junction block stud.
- Remove the positive battery cable retainer (1) from the rocker panel.
- Remove the positive battery cable retainers (2, 3 and 4) from the body harness channel.
- Remove the positive battery cable clips (2, 3, and 4) from the body harness retainers.
- Remove the positive battery cable clip (5) from the dash mat.
- Reposition the dash mat flap (1).
- From under the hood, disengage the junction block cover lock tabs.
- Remove the junction block cover.
- Remove the nut (1) securing the starter solenoid cable to the bussed electrical center (BEC).
- Remove the starter solenoid cable from the BEC stud.
- Remove the positive battery cable (1) from the BEC stud.
- Remove the positive battery clips (2) from the side engine compartment.
- Carefully unseat the positive battery cable grommet (1) from the front of dash.
- From inside the vehicle, carefully remove the positive battery cable by pulling the cable through the front of dash and out of the vehicle.