FixVault

Installation Procedure

  1. Position the engine ground cable to the engine.
    Fig 1: Installing Engine Ground Cable
    G01786206Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to FASTENER NOTICE .
  2. Install the bolt securing the engine ground cable to the generator.

    Tighten 

    Tighten the generator mounting bolt to 50 N.m (37 lb ft).

  3. Install the bolt (1) securing the engine ground cable (2) to the right side body frame rail.

    Tighten 

    Tighten the engine ground cable bolt to 50 N.m (37 lb ft).

  4. Install the upper filler panel. Refer to FILLER PANEL REPLACEMENT - UPPER .