FixVault

Installation Procedure

    Fig 1: Removing & Installing Data Link Connector
    GM700917Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  1. Install the screws securing the data link connector to the I/P carrier.

    Tighten:  Tighten the screws to 2 N.m (18 lb in).

  2. Install the I/P closeout panel. Refer to Closeout/Insulator Panel Replacement - Left .