FixVault

Installation Procedure

  1. Connect the electrical connectors to the DIM.
  2. Locate the DIM to the bracket on the I/P.
  3. Push the DIM in order to lock the bracket retainers.
  4. Fig 1: View Of DIM
    GM1273278Courtesy of GENERAL MOTORS CORP.
  5. Install the I/P compartment. Refer to Compartment Replacement - Instrument Panel (I/P) in Instrument Panel, Gages, and Console.
  6. Reprogram the DIM. Refer to Body Control Module (BCM) Programming/RPO Configuration (RIM)  or Body Control Module (BCM) Programming/RPO Configuration (DIM) .