FixVault

Installation Procedure

    Fig 1: View Of Data Link Connector
    GM1386648Courtesy of GENERAL MOTORS CORP.
  1. Locate the connector to the I/P.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the screws (1) securing the connector to the I/P.

    Tighten:  Tighten the screws (1) to 2 N.m (18 lb in).

  4. Install the knee bolster trim. Refer to Knee Bolster Replacement in Instrument Panel, Gages, and Console.