FixVault

Fastener Specifications

Application Specification
Metric English
Front Lower Control Arm Bushing Bolt (GNA, GNB) (Requires a NEW Bolt.) 
  • First Pass:
55 N.m 41 lb ft
  • Final Pass:
90-105 degrees
Front Lower Control Arm Front Bolt (GNA, GNB) (Requires a NEW Bolt.) 
  • First Pass:
100 N.m 74 lb ft
  • Final Pass:
75-90 degrees
Front Lower Control Arm Rear Nut (GNA, GNB) (Requires a NEW Bolt.) 
  • First Pass:
100 N.m 74 lb ft
  • Final Pass:
75-90 degrees
Front Shock Absorber Yoke Nut (GNB) (Requires a NEW Nut.)  100 N.m 74 lb ft
Front Stabilizer Shaft Insulator Clamp Bolt (GNA, GNB) (Requires a NEW Bolt.) 
  • First Pass:
22 N.m 16 lb ft
  • Final Pass:
30-45 degrees
Front Stabilizer Shaft Link Nut (GNA, GNB) 65 N.m 48 lb ft
Front Suspension Strut Mount Nut (GNA, GNB) 55 N.m 41 lb ft
Front Suspension Strut Nut (GNA, GNB) 70 N.m 52 lb ft
Front Wheel Bearing and Hub Assembly Bolt (GNA, GNB) (Requires a NEW Bolt.) 
  • First Pass:
100 N.m 74 lb ft
  • Final Pass:
60-75 degrees
Steering Knuckle Camber Adjust Nut- Lower (GNB)
  • First Pass:
115 N.m 85 lb ft
  • Final Pass:
45-60 degrees
Steering Knuckle Camber Adjust Nut- Upper (GNB) (Requires a NEW Bolt and Nut.) 
  • First Pass:
100 N.m 74 lb ft
  • Final Pass:
45-60 degrees
Steering Knuckle King Pin Bolt (GNB) 7 N.m 62 lb in
Steering Knuckle King Pin Bushing Nut (GNB)(Requires a NEW Nut.) 
  • First Pass:
100 N.m 74 lb ft
  • Second Pass:
Loosen Both Nuts One Complete Revolution
  • Final Pass:
100 N.m 74 lb ft
Steering Knuckle Nut@Front Lower Control Arm (GNB) 145 N.m 107 lb ft
Steering Knuckle Nut @ Front Lower Control Arm (GNB) (Requires a NEW Bolt.) 
  • First Pass:
115 N.m 85 lb ft
  • Final Pass:
120-135 degrees
Steering Knuckle Nut@Front Suspension Strut Yoke Upper Ball Joint (GNB)
  • First Pass:
45 N.m 33 lb ft
  • Final Pass:
30-45 degrees
Steering Knuckle Nut @ Strut Assembly (GNA) (Requires a NEW Bolt.) 
  • First Pass:
85 N.m 63 lb ft
  • Final Pass:
60-75 degrees