Installation Procedure
Water Outlet Seal (2) - Install NEW
- Engine Coolant Flow Control Valve (1) - Install
- CAUTION:
Engine Coolant Flow Control Valve Bolt (1) - Install and tighten [ 4x ] 8.5 N.m (75 lb in)
Electrical Connector (2) @ Engine Coolant Temperature Sensor - Connect
- Electrical Connector (1) @ Engine Coolant Flow Control Valve - Connect
Electrical Connector (1) @ Engine Coolant Flow Control Valve - Connect
Engine Coolant Air Bleed Hose (4) @ Engine Coolant Flow Control Valve - Install
- Engine Coolant Air Bleed Hose (3) @ Engine Coolant Flow Control Valve - Install
- Engine Oil Cooler Coolant Inlet Hose (2) @ Engine Coolant Flow Control Valve - Install
- Hose Clamp (1) - Engage [ 3x ] - Hose Clamp Replacement Guidelines - Spring Type
Radiator Inlet Hose (3) @ Engine Coolant Flow Control Valve - Install
- Thermostat Bypass Hose (2) @ Engine Coolant Flow Control Valve - Install
- Hose Clamp (1) - Engage [ 2x ] - Hose Clamp Replacement Guidelines - Spring Type
- Intake Manifold - Install - Intake Manifold Replacement
Charge Air Cooler Outlet Air Tube (2) - Install - Charge Air Cooler Outlet Air Hose Replacement
- Fill the cooling system. Cooling System Draining and Filling (LGX Static Fill) Cooling System Draining and Filling (LGX GE 47716) Cooling System Draining and Filling (LSY Static Fill) Cooling System Draining and Filling (LSY GE 47716)
- Start the engine and check for leaks.