FixVault

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V6,3.8L Eng,229CID Eng,Eng VIN 926.2A
V6,3.8L Eng,231CID Eng,Eng VIN A26.9A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
V6, Where Air Cond interferes add0.6A
Where Air Pump interferes add0.4A
Where Cruise Control interferes add0.2A
Where Elect Eng System interferes add0.5A
Where Pwr Strg Interferes add0.4A
Combination Procedure: CAMSHAFT BEARING: Remove & Replace:
Each0.3A
Combination Procedure: ROCKER ARM (REMOVED): Reface:
Eight0.4B
Sixteen0.8B
Twelve0.6B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A