System Testing
Allow choke valve to close. Start engine. Ensure choke valve begins to open and choke housing is heated. Unplug wiring connector. Measure resistance with ohmmeter. Resistance should be about 19-24 ohms at 68°F (20°C).
Allow choke valve to close. Start engine. Ensure choke valve begins to open and choke housing is heated. Unplug wiring connector. Measure resistance with ohmmeter. Resistance should be about 19-24 ohms at 68°F (20°C).