FixVault

Installation Procedure

NOTE: Refer to FASTENER NOTICE in Cautions and Notices.

Important:  Clean any existing corrosion from the battery terminal bolt flange and the battery cable end.

Install the battery ground (negative) cable and bolt to the battery.

Tighten 

Tighten the battery terminal bolt to 15 N.m (11 lb ft).

Fig 1: Installing Battery Ground (Negative) Cable And Bolt From Battery 4.3L
G01646491Courtesy of GENERAL MOTORS CORP.