FixVault

Installation Procedure

    Fig 1: Identifying Pivot Points
    GM442716Courtesy of GENERAL MOTORS CORP.
  1. Install the automatic shift lock actuator to the base of the shift lock control and the pivot point (1).
  2. Fig 2: Automatic Transmission Shift Lock Control Actuator Electrical Connector
    GM190956Courtesy of GENERAL MOTORS CORP.
  3. Connect the automatic shift lock actuator electrical connector.
  4. Install the center console. Refer to Console Replacement - Front Floor (Impala) or Console Replacement - Front Floor (Monte Carlo) in Instrument Panel, Gages and Console.
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.