FixVault

Installation Procedure

  1. Connect the antenna lead to the antenna base.
  2. Run the antenna lead through the fender hole
  3. Align the lead with the antenna base.
    NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
  4. Tighten the locking nut and fasten the antenna base to the fender.

    Tighten 

    Tighten the nut to 5 N.m (44 lb in).

    Fig 1: Connecting Antenna Lead To Antenna Base
    G01534296Courtesy of GENERAL MOTORS CORP.