FixVault

Engine Assembly (Complete): Remove & Replace

WARNING: This page is about the Avalanche 1500, 4WD, which is a different variant/trim than selected.
Includes: R&I Engine Assembly. Transfer Fuel and Electrical Assemblies and Engine Mounts. DOES NOT include transfer of Manifolds, Valve Cover(s), Timing Cover(s), Oil Pan and/or Water Pump. NOTE: For bare Engine, refer to Long Block - R&R.

Applies ToNoteStandard HoursWarranty HoursSkill Level
1500,5.3L EngIncludes: Transfer all necessary parts to GM exchange Engine. Includes: Recover, Evacuate and Recharge Air Conditioning System.15.9B
Additional Procedure: ENGINE ASSEMBLY (COMPLETE): Remove & Replace:
w/Auxiliary Trans Cooler add0.4B
w/Skid Plate add0.3B
Where Eng Oil Cooler interferes add0.4B