FixVault

Installation Procedure

    Fig 1: View Of Electrical Connectors
    GM318110Courtesy of GENERAL MOTORS CORP.
  1. Connect the electrical connectors.
  2. Install the switch bank into the IP by pushing in on the switch bank.
  3. Fig 2: Locating Bolts/Screws For IP Switch Bank
    GM318109Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  4. Install the bolts/screws to secure the switch bank to the instrument panel.

    Tighten:  Tighten the bolts/screws to 2.5 N.m (22 lb in).

  5. Install the IP accessory trim plate. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper .