FixVault

Installation Procedure

    Fig 1: View Of ISU Nuts
    GM1256921Courtesy of GENERAL MOTORS CORP.
  1. Install the ISU with the nuts.
  2. Connect the electrical connectors.
  3. Fig 2: View Of Driver Side Knee Bolster And Bolts
    GM1256639Courtesy of GENERAL MOTORS CORP.
  4. Install the knee bolster. Refer to Knee Bolster Replacement in Interior Trim.
  5. Install the instrument panel under cover.
  6. Connect the negative battery connector.