Installation Procedure
- Position the auxiliary generator (4).
- Install the auxiliary generator bolts (3).
Tighten: Tighten the generator bolts to 50 N.m (37 lb ft).
- Install the positive cable to the auxiliary generator, perform the following:
- Position the positive cable.
- Install the positive cable nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Slide the boot to cover the terminal stud.
- Connect the generator electrical connector.
- Install the drive belt. Refer to Drive Belt Replacement .
- Install the upper shroud. Refer to Engine Coolant Fan Upper Shroud Replacement (4.3L, 4.8L, 5.3L, 6.0L) or Engine Coolant Fan Upper Shroud Replacement (6.6L) .
NOTE:
Refer to Fastener Notice
.