Installation Procedure
- Place the shift lever in Neutral.
- Install the park/neutral start switch.
Tighten: Tighten the bolts to 10 N.m (89 lb in) .
- Use DT 46473 (1) to adjust the start switch. See Special Tools .
- Install the shift lever and the shift lever nut.
Tighten: Tighten the nut to 10 N.m (89 lb in) .
- Connect the shift control cable and the retaining clip.
- Connect the electrical connector to the park/neutral position switch.
- Connect the negative battery cable.
NOTE:
Refer to Fastener Notice
.