FixVault

Installation Procedure

    Fig 1: View Of Throttle Body Assembly And Retainers
    GM1820579Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice .
  1. Install the throttle body.

    Tighten:  Tighten the throttle body retaining bolts and nuts to 9 N.m (79.7 lb in)  .

  2. Connect the ETC connector.
  3. Install the charge air cooler outlet hose.
  4. Install the engine cover. Refer to Engine Cover Replacement .
  5. Connect the negative battery cable.