FixVault

Installation Procedure

    Fig 1: Battery Tray And Bolts
    GM2027666Courtesy of GENERAL MOTORS CORP.
  1. Install the battery tray (2).
  2. CAUTION: Refer to Fastener Caution .
  3. Install the 3 battery tray bolts (1) and tighten to 15 N.m (11 lb ft).
  4. Clip in the radiator surge tank engine hose to the battery tray.
  5. Install battery. Refer to Battery Replacement .
  6. Clip in all wiring harness at the battery tray.
  7. Clip in the engine control module bracket to the battery tray.
  8. Close the hood.