FixVault

Component Testing

  1. Ignition OFF, disconnect the CMP actuator solenoid harness connector at the CMP actuator solenoid.
  2. IMPORTANT: Ensure component is tested at 20°C (68°F).
  3. Test for 4.6-5.2 ohms of resistance between the high control terminal 1 and the low reference terminal 2 of the CMP actuator solenoid.
    • If the resistance is not within the specified range, replace the CMP actuator solenoid.