FixVault

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
    Fig 1: Battery Energy Control Module Fasteners
    GM2596562Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

  1. Install the battery energy control module (2) to the mounting studs and tighten the fasteners (1) to 9 N.m (80 lb in).
  2. Fig 2: Connectors
    GM2596563Courtesy of GENERAL MOTORS COMPANY
  3. Install the connectors (1) and connector (2).
  4. Fig 3: Identifying Connectors Disconnect/Connect Sequence
    GM2596566Courtesy of GENERAL MOTORS COMPANY
  5. Connect the remaining connectors, in the above sequence, to the battery energy control module.
  6. Enable the hybrid battery. Refer to High Voltage Enabling .
  7. Program the battery energy control module. Refer to Battery Energy Control Module Programming and Setup .