FixVault

Installation Procedure

  1. Clip in the level and temperature emission reduction fluid tank module (1) to the emission reduction fluid tank.
    Fig 1: Temperature Emission Reduction Fluid Tank Module And Wiring Harness Connectors
    GM3216252Courtesy of GENERAL MOTORS COMPANY
  2. Connect the wiring harness connectors (2) to the level and temperature emission reduction fluid tank module (1).
  3. Install the emission reduction fluid tank insulator - upper. Refer to Emission Reduction Fluid Tank Insulator Replacement - Upper .