FixVault

Installation Procedure

    Fig 1: Exhaust Front Pipe Exploded View Installation
    GM3819551Courtesy of GENERAL MOTORS COMPANY
  1. Install a NEW gasket. (6) [3x]
  2. Exhaust Front Pipe (8) - Install
    CAUTION:

    Refer to Fastener Caution .

  3. Exhaust Front Pipe Nut (13) - Tighten 48 N.m (35 lb ft) [2x]
  4. Three-Way Catalytic Converter Replacement  - Connect @ Exhaust Front Pipe