Installation Procedure
- Install the battery positive cable (5) to the generator B (+) stud and tighten the generator B (+) nut (2) to 14 N.m (10 lb ft).
- Install the protective cover (3).
- Install the battery positive cable nut (1) and tighten to 14 N.m (10 lb ft).
- Install the battery positive cable ground bolt (4) and tighten to 22 N.m (16 lb ft).
- Install the battery positive cable (2) to the frame stud ground and tighten the battery negative and positive ground nut (1) to 22 N.m (16 lb ft).
- Install the battery. Battery Replacement .
- Install the battery positive cable retainers (1) and the battery positive cable to the battery tray.
- Install the battery positive cable (3) to the battery and the engine wiring harness junction block.
- Install the battery positive cable junction block post nut (1) and tighten to 6 N.m (53 lb in).
- Install the engine wiring harness junction block nut (2) and tighten to 22 N.m (16 lb ft).
- Install the body wiring harness (2) to the battery positive cable junction block and connect the body wiring harness connectors (1).
- Install the battery positive cable terminal cover (2).
- Install the engine wiring harness junction block cover (1).
- Install the engine control module (S53) to the battery tray. Engine Control Module Replacement
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution .