FixVault

Ignition Coil Replacement - Bank 2

GM4755490
Callout Component Name
Preliminary Procedure 
Remove the front positive crankshaft ventilation tube. Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (Air Cleaner Outlet Duct to Camshaft Cover)Positive Crankcase Ventilation Hose/Pipe/Tube Replacement (Intake Manifold to Camshaft Cover)
1 Electrical Connector [3x]
Procedure 
Disconnect the electrical connectors.
2 Ignition Coil Bolt [3x]
CAUTION:

Refer to Fastener Caution .


Tighten 
10 N.m (89 lb in)
3 Ignition Coil [3x]