Installation Procedure
- Battery Positive Post Terminal (2) @ Battery Distribution Fuse Block (1) - Install
- Battery Positive Cable (3) @ Battery Distribution Fuse Block (1) - Install
- Battery Distribution Fuse Block Nut (1) - Install and tighten 22 N.m (16 lb ft)CAUTION:
Refer to Fastener Caution .
- Body Wiring Harness Connector (2) @Battery Distribution Fuse Block - Connect
- Body Wiring Harness Nut (1) @Battery Distribution Fuse Block - Install and tighten 5 N.m (44 lb in)
- Battery Tray Support (2) - Install
- Battery Tray Support Nut (1) - Install and tighten 9 N.m (80 lb in)
- Battery Positive Cable Protective Cover (1) - Install
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection