FixVault

Installation Procedure

  1. GM4214764Courtesy of GENERAL MOTORS COMPANY

    Battery Cover (1) - Install

  2. GM4214763Courtesy of GENERAL MOTORS COMPANY

    Battery Hold Down Retainer (3) - Install

  3. CAUTION:

    Refer to Fastener Caution

  4. Battery Hold Down Nut (2) - Install and tighten 9 N.m (80 lb in)
  5. Battery Hold Down Bolt (1) - Install and tighten [3X] 9 N.m (80 lb in)
  6. GM4214761Courtesy of GENERAL MOTORS COMPANY

    Battery Distribution Engine Compartment Fuse Block (3) - Install

  7. Battery Positive Post Clamp Nut (1) - tighten 9 N.m (80 lb in)
  8. Battery Distribution Engine Compartment Fuse Block Cover (2) - Install
  9. Connect the negative battery cable. Battery Negative Cable Disconnection and Connection (Without KL9) , or Battery Negative Cable Disconnection and Connection (With KL9)