Installation Procedure
Battery Cover (1) - Install
Battery Hold Down Retainer (3) - Install
- Battery Hold Down Nut (2) - Install and tighten 9 N.m (80 lb in)
- Battery Hold Down Bolt (1) - Install and tighten [3X] 9 N.m (80 lb in)
Battery Distribution Engine Compartment Fuse Block (3) - Install
- Battery Positive Post Clamp Nut (1) - tighten 9 N.m (80 lb in)
- Battery Distribution Engine Compartment Fuse Block Cover (2) - Install
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection (Without KL9) , or Battery Negative Cable Disconnection and Connection (With KL9)
CAUTION:
Refer to Fastener Caution