FixVault

Fuse Block: Installation

WARNING: This page is about a different car, the 2005 Dodge SX, 2005 Dodge SRT-4, and 2005 Dodge Neon. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the instrument panel wire harness to the instrument panel.
  2. Install all items removed from the instrument panel to gain access to the wire harness.
  3. Install the instrument panel. (Refer to BODY/INSTRUMENT PANEL/INSTRUMENT PANEL ASSEMBLY - INSTALLATION) .