FixVault

Powertrain Control Module: Installation

Fig 1: PCM Assembly
GC0000030Courtesy of DAIMLERCHRYSLER CORP.
  1. Install the PCM.
  2. Install the 3 mounting screws. See Fig 1.
  3. Tighten screws.
    NOTE: The PCM connectors are color coded.
    Fig 2: PCM Location
    GC0000028Courtesy of DAIMLERCHRYSLER CORP.
  4. Install and lock the 4 electrical connectors. See Fig 2.
  5. Install the left front splash shield.
  6. Install the left front wheel.
  7. Lower vehicle.
  8. Connect the negative battery cable.