Pump, Air: Installation: Installation
- Install the air pump (3) to the bracket (4) with three nuts (5) tightened to 8 N.m (71 in. lbs.).
- Connect and lock the air pump electrical connector (1).
- Engage the air pump electrical connector (2) to the back of the air pump.Fig 2: Oxygen Sensor Connector Retainer, Lower Heatshield Bolt, Air Pump Relay, Upper Heatshield Bolt & Heatshield
Courtesy of CHRYSLER LLC
NOTE:Air pump not shown.
- Install the air pump heatshield (5) with the upper mounting bolt (4).
- Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
- Install the air pump relay (3) and lower heatshield bolt (1). Tighten the bolt to 8 N.m (71 in. lbs.).
- Engage the oxygen sensor connector retainer (2) to the heatshield (5).
- Lower the vehicle.
- Tighten the upper heatshield bolt (4) to 8 N.m (71 in. lbs.).
- Install the air inlet hose (3) to the air pump inlet (2).
- Install the connecting tube (1) to the air pump (2).
- Install the PCM and PCM bracket (1) with two bolts (2) tightened to 10 N.m (89 in. lbs.).
- Position the air injection pump assembly wire harness. Connect and lock the two electrical connectors (3).
- Engage two wire harness retainers (1) to the back of the PCM bracket.
- Engage the purge tube retainer (2) to the bottom of the PCM bracket.
- Engage the wire harness retainer (2) to the top of the PCM bracket.
- Engage the engine harness connector retainer (1) to the back of the PCM bracket.
- Connect and lock the engine wire harness connector (4).
- Connect and lock the two PCM wire harness connectors (3).
- Connect the negative battery cable and tighten nut to 5 N.m (45 in. lbs.).
- Install the engine cover.