Removal & Installation
WARNING: This page is about the Ram 50 Custom, Trans Mfr CD KM130, which is a different variant/trim than selected.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 4 Spd Trans,RWD,In-Line4 | 3.6 | C | ||
| Additional Procedure: TRANSMISSION ASSEMBLY: Removal & Installation: | ||||
| Where Skid Plate interferes add | 0.4 | 0.4 | C | |
| Combination Procedure: CLUTCH PILOT BEARING: Remove & Replace: | ||||
| 0.9 | C | |||
| Combination Procedure: CLUTCH PRESSURE PLATE: Remove & Replace: | ||||
| 0.6 | C | |||
| Combination Procedure: CLUTCH RELEASE BEARING: Remove & Replace: | ||||
| 0.2 | C | |||
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.9 | C | |||
| Combination Procedure: TRANSMISSION ASSEMBLY: Replace: | ||||
| 0.4 | C | |||