FixVault

Power Distribution Center: Installation

  1. Connect electrical harness connectors to Power Distribution Center (PDC).
  2. Position PDC and engage into the retaining tabs.
  3. Connect the battery negative cable.
    Fig 1: Installing Power Distribution Center
    G03521128Courtesy of DAIMLERCHRYSLER CORP.