FixVault

Power Distribution Center: Installation

Fig 1: Installing PDC
GC0012513Courtesy of DAIMLERCHRYSLER CORP.
  1. Connect electrical harness connectors to Power Distribution Center (PDC).
  2. Position PDC and engage into the retaining tabs.
  3. Connect the battery negative cable.