FixVault

Front Axle: Installation

GC0145633Courtesy of CHRYSLER GROUP, LLC
  1. Lift the axle into vehicle.
    GC0146094Courtesy of CHRYSLER GROUP, LLC
  2. Install the front axle tube bushing mounting bolt and nut (1) in the RH axle bracket (2) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
  3. Install frame dampener (4) and bolts (3) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
    GC0146093Courtesy of CHRYSLER GROUP, LLC
  4. Install the front axle cover bushing bolt (2) and front axle pinion nose bushing bolt (1) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
  5. Install front axle vent tube and ensure orientation is correct. Vent Tube needs to be fully seated to vent nipple and then can be orientated to correct position.
    GC0146238Courtesy of CHRYSLER GROUP, LLC
  6. Using axle seal protector (special tool #10270, Protector, Half Shaft, Drive), install both axle shafts into the axle carefully avoiding damage to axle seals.
    GC0146092Courtesy of CHRYSLER GROUP, LLC
  7. Install both axle shafts into the steering knuckles (2), and hub bearing.
    GC0085744Courtesy of CHRYSLER GROUP, LLC
  8. Install the upper ball joints into the steering knuckles (2) and tighten nuts (1) to the proper specification. Refer to FRONT, TECHNICAL SPECIFICATIONS .
  9. Install both brake calipers. Refer to CALIPER, DISC BRAKE, INSTALLATION .
    GC0145669Courtesy of CHRYSLER GROUP, LLC
  10. Install the tie rod ends (1) on the steering knuckles (2) and tighten to the proper specification. Refer to FRONT, TECHNICAL SPECIFICATIONS .
  11. Align the shock clevises (1) with the lower control arms and install the clevis brackets. Refer to SHOCK ABSORBER, SUSPENSION, INSTALLATION .
  12. Install the stabilizer bar links (1) and tighten bolts (2) to the proper specification. Refer to FRONT, TECHNICAL SPECIFICATIONS .
    GC0146090Courtesy of CHRYSLER GROUP, LLC
  13. Install the half shaft (2) hub nuts (1) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
    GC0146089Courtesy of CHRYSLER GROUP, LLC
  14. Install the propeller shaft (1) with reference marks (3) aligned.
    NOTE:

    Clean propeller shaft bolts and apply Mopar Lock and Seal Adhesive or equivalent to the threads before installation.

  15. Install the propeller shaft bolts and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
  16. Install the front wheel and tire assemblies. Refer to WHEELS, STANDARD PROCEDURE .
  17. Fill the differential with gear lubricant. Refer to CAPACITIES AND RECOMMENDED FLUIDS, SPECIFICATIONS .
  18. Install fill plug and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
  19. Install the skid plate, if equipped. Refer to INSTALLATION .
  20. Pump brake pedal until caliper pistons and brake pads are seated and a firm brake pedal is obtained.