FixVault

Sensor, Pressure Control: Installation

GC0122778Courtesy of CHRYSLER GROUP, LLC
  1. Install the line pressure sensor (2) on the valve body.
  2. Install the fasteners (1) to the line pressure sensor and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0122509Courtesy of CHRYSLER GROUP, LLC
  3. Install the valve body oil pan (1), use a bead of MOPAR® ATF RTV (MS-GF41).
  4. Install the valve body oil pan fasteners (2) and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0122510Courtesy of CHRYSLER GROUP, LLC
  5. Install the pressure tap (2) at valve body oil pan and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0122777Courtesy of CHRYSLER GROUP, LLC
  6. Install the fastener (2) at the ground cable (3) and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
  7. Install the cable retainer (1) to the valve body oil pan.
    GC0122507Courtesy of CHRYSLER GROUP, LLC
  8. Install the front sound damper cover (2) and install the fasteners (1).
    GC0122776Courtesy of CHRYSLER GROUP, LLC
  9. Move left side inner wheel splash shield (2) in place.
  10. Install the left side inner wheel splash shield screws (1).
  11. Remove the support and lower the vehicle.
    GC0122501Courtesy of CHRYSLER GROUP, LLC
  12. Connect the solenoid pack connector (2) wire harness connectors.
    GC0122775Courtesy of CHRYSLER GROUP, LLC
  13. Install the fasteners (1) holding the power steering lines (2) and tighten to the proper torque specifications. Refer to TECHNICAL SPECIFICATIONS .
    GC0121541Courtesy of CHRYSLER GROUP, LLC
  14. Install shift cable (1) to manual lever (2).
    GC0122774Courtesy of CHRYSLER GROUP, LLC
  15. Install upper radiator hose (2) and clamps (1).
  16. Fill the cooling system. Refer to STANDARD PROCEDURE .
    GC0122773Courtesy of CHRYSLER GROUP, LLC
  17. Install the relay (1) to the bracket (2) at the core support.
  18. Install the battery and battery tray. Refer to TRAY, BATTERY, INSTALLATION .
  19. Fill transmission and road test. Refer to FLUID, STANDARD PROCEDURE .