FixVault

Switch, Inertia: Installation

GC0160172Courtesy of CHRYSLER GROUP, LLC
  1. Position the inertia switch onto the studs. Tighten the nuts (1) to the proper

    Refer to FUEL DELIVERY, GAS, TECHNICAL SPECIFICATIONS .

  2. Reconnect the electrical connector (2).
    GC0160404Courtesy of CHRYSLER GROUP, LLC
  3. If required, reset the inertia switch.