FixVault

Installation - PDC Assembly

  1. Position the Power Distribution Center (PDC) Assembly bracket (2) into the engine compartment.
  2. Install the fasteners (1) and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0184432Courtesy of CHRYSLER GROUP, LLC
  3. If needed, install the Powertrain Control Module (PCM) and bracket. Refer to MODULE, POWERTRAIN CONTROL (PCM), INSTALLATION .
  4. Position the PDC Assembly tray onto the PDC Assembly bracket.
  5. Connect the wiring harness connectors (1) to the PDC Assembly (2).
    GC0184489Courtesy of CHRYSLER GROUP, LLC
  6. Install the PDC Assembly tray (1) onto the PDC Assembly bracket (2).
    GC0184546Courtesy of CHRYSLER GROUP, LLC
  7. Install the PDC Assembly B(+) terminals and fastener (1) onto the PDC Assembly post. Tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
    GC0184488Courtesy of CHRYSLER GROUP, LLC
  8. Install the PDC Assembly cover (1) onto the PDC Assembly (2).
    GC0184436Courtesy of CHRYSLER GROUP, LLC
  9. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.